Skip to content

Bolting of mine workings maintained with combined mining methods

UDC: 622.281.76
EDN: VVEDGT
Received: 30.03.2010
Published: 13.04.2010

Original language: ru

Full text of the article | JATS XML

Bulatnikov A. A.
Makarov S. V.

Abstract
From a position of guaranteeing of steel-polymer anchor and frame arch shore interrelation, erected with preliminary thrust, preconditions of the problem solving of reuse of developments behind the clearing face in the conditions of weak unstable breeds are presented. Parameter γН/R, intended for an estimation of stability criterion of a flat exposure of excavation roof, that coordinating mining depth of and rock strength on one-axis compression, are presented.

REFERENCES
  1. А. Н. Ермаков. Опыт применения анкерной крепи в шахто-управлении «Луганское» / Ермаков А. Н, Ровенский В. В, Бабнюк Г. В, Пунтус В. Ф. // Уголь Украины − 2009. № 1. с. 2
  2. Ю. З. Заславский. Исследование проявления горного давления в капитальных выработках глубоких шахт Донецкого бассейна / М: Недра, 1966. С.139-145.
  3. А. О. Новиков, С. Ю. Гладкий, И. Н. Шестопалов. Об особенностях деформирования породного массива вмещающего подготовительные выработки с анкерным креплением. // Известия Донецкого горного института – Донецк: ДонГТУ.
Мы используем файлы cookie и рекомендательные технологии. Пользуясь сайтом, вы соглашаетесь с Политикой обработки персональных данных.
Принять
Политика конфиденциальности